Highway I-44 Widening
Eureka, Missouri

  • Civil engineering services provided for widening of I-44 Allenton road to the Franklin County line - a distance of three miles
  • One additional traffic lane in each direction was provided, including adjustments to culverts and shoulders
Woodson Road Enhancement Project
Overland, Missouri

  • Civil engineering services provided
  • Improvements serve both residential and commercial properties
  • New curbs, sidewalks, planter boxes with landscape materials, irrigation, driveway modifications and stormwater drainage improvements were all included in this project
Clayton Wydown Street Improvements
St. Louis, Missouri

  • Street Improvements for private subdivision
  • New granite curb alignments, lighting and irrigation
  • Street reconstruction throughout subdivision
  • Intersections designed with traffic calmer circles
Clayton Hillcrest Street Improvements
St. Louis, Missouri

  • Over 12,000 lineal feet of street improvements
  • Subdivision lighting
  • New curbs, sidewalks, driveway approaches and inlets
  • Pavement removal, replacement, milling and overlay
Spoede and Ladue Road Enhancement Project
Creve Coeur, Missouri

  • Traffic signal and controller relocation
  • Addition of pedestrian crossing
  • Versalok wall with landscaping for grade control and project enhancement
  • Traffic signal island relocations
  • Striping of intersection for pedestrian crossing
  • ADA compliance including sidewalk ramps
  • Street pavement milling and overlay including concrete curbs
Shackelford Road
Florissant, Missouri

  • This project was a 1,786 meter (1.11 mile) highway design and box culvert replacement project
  • Extensive right-of-way phase for property acquisition
  • Final construction plans in metric units (the first such project for St. Louis County)
  • Widening of existing two-lane to a five-lane roadway on a new alignment
  • Replacement of two 7' x 9' existing box culverts
Pitman Hill Road Improvements
St. Charles County, Missouri

  • Study of existing traffic patterns and counts in project area enabled EDM to prepare a Traffic Circulation Option Plan
  • The report resulted in recommendations given to federal, state and local permitting authorities for improvements to Pitman Hill Road
  • All designs were prepared in accordance with applicable provisions and requirements
  • Design incorporated multiple box culverts