


 
 
 
 
 
 
 
 
 
 
 
 



|
 |
 |

 Capital Improvement Studies
Campus Site Analysis and Design
Elementary and Secondary Schools
Energy Studies
Needs Assessment / Bond Issue Support
Universities Facilities
- Labs
- Classrooms
- Athletic Facilities
- Libraries
 |
Rockwoold School District St. Louis, Missouri
- As a result of the 2003 bond issue, EDM was awarded a project to prepare plans and specifications for a secondary entrance to Marquette High School, another contract for district-wide floor replacements, and a new field house for Marquette High School.
|  |
 | Fort Zumwalt School District St. Charles, Missouri
- The Fort Zumwalt School District is a large, fast growing district in St. Charles County. The district has a critical need to rapidly respond to the explosive residential growth of the district area in an economical and flexible manner. EDM has been selected to maintain a prototypical elementary school master plan designed to meet these goals. Projects include:
- Twin Chimney Elementary
- Emge Elementary
- Ostmann Elementary
- North High School addition
|  |
 | Crestview School St. Louis County, Missouri
- Redesign and replacement of exterior walkways, ramps and stairs
- Installation of new energy management, fire alarm and emergency lighting system
- Renovations to existing walkway canopies and the addition of new canopies
- Interior finish upgrades including new ceilings, floor coverings and wall finishes
|  |
 | St. Louis University - Site Improvements St. Louis, Missouri
- Civil design for parking garage entrances, drive aprons and sidewalks
- Structural design for brick and steel archways used to mark University boundaries
|  |
 | Parks College Convocation Center Cahokia, Illinois
- Prime consultant for feasibility study and design of new alumni student center
- Facility includes 600-seat auditorium, NCAA Division 3 gymnasium and athletic offices
- Computers located in the security office control the entire lighting system
|  |
 | University of Missouri Engineering Building Columbia, Missouri
- Use of exposed concrete and integrated building systems result in a striking presence adjacent to Jesse Hall
- Full engineering services for new facility for Engineering College
|  |
 | University of Missouri Thomas Jefferson Library St. Louis, Missouri
- Mechanical, electrical, plumbing and fire protection design for new 50,000 square foot facility
- Lighting design features low energy consumption
|  |
|
|
|