Is your community ready to comply with NPDES Phase II stormwater regulations?
  
Mandatory Requirements for:
CONSTRUCTION SITE STORM WATER RUN-OFF CONTROL
  
  • Develop, implement and enforce a program to reduce pollutants from construction activities >= 1 < 5 acres
  • Develop a regulatory mechanism to require erosion and sediment controls and sanctions
  • Require construction site operators to control waste
  • Require construction site operators to implement BMP's
  • Develop procedures for site plan review
  • Develop procedures for receipt and consideration of information submitted by the public
  • Develop procedures for site inspection and enforcement of control measures
  
Best Management Practices for:
CONSTRUCTION SITE STORM WATER RUN-OFF CONTROL
  
  • Minimize clearing
  • Stabilize drainage ways
  • Protect step slopes
  • Protect waterways
  • Utilize phase construction
  • Install perimeter controls
  • Install sediment trapping devices
  • Protect inlets
  • Educate personnel
  • Identify waste control needs
  • Utilize spill control planning
  